Branch: Automotiv Supplier Industry
Material: Aluminium
Machine: Horizontal Machinig Center NBH 95
Machining: Pre-machining/Cubing in 2 clampings/operations:
1. Operation Raw part clamping, height adjustment using rest pads located in the crankshaft area, longitudinal and transverse adjustment in liners, transverse adjustment in crankshaft area, 4 clamping points on the oil pan. Cycle time: Approx. ca. 1.8 min. Machining: 4-Sided machining, milling (also notice surfaces for 2 set-ups), boring, countersinking, threading, reaming
2. Operation 4 rest pads, 2 transverse-, 1 longitudinal rests, Cylinder for transverse and longitudinal adjustments, 3 Facing Clamps from above. Cycle time: Approx. ca. 1.7 min. Machining: milling, chamfering, boring, countersinking, threading | 
 Clamping fixture 1. operation.
 Clamping fixture 2. operation.
|